M C.R.E. No. M.
Kowloon Canton Railway.
ECON
BRITISH SECTION.
ESTIMATE.
114
Main Head.
Sub. Head.
Bridges,
Minor Bridge No.39.
32.
Work
One 5 ft Arch at ch.89*600
Drawing C.R.E. No.269"
AMOUNT.
Quantity. DESCRIPTION. Rate. Unit. Cts. 9,300 Excavation in foundations. 35/- 1,435.00 4,100 Timbering and pumping. 40/- % 2/- 0.ft 1,380.00 3,450 Concrete in foundations. 1,920.00 Masonry in superstructure. 10/- #60 Masonry in Arches. 240.00 130 Masonry in coping. 11 30 8 8 8 8 8 8 8 9 1,130 Dry stone backing. 10 93.00 300 Total 5,379.00 Contingencies 10% 537.93 Grand Total 5,917.23Eu
Blin Hotns? noolwo
.KOITO12 HEITIHA
W20.5.5.0 neivas
1970
3TAMIT23
ZOITINDON
M C.R.E. No. M.
Kowloon Canton Railway.
ECON
BRITISH SECTION.
ESTIMATE.
114
GE
Cooll nis!
Main Head.
Sub. Head..
Bridges,
Minor Bridge No.39.
32.
Work
One 5 ft Arch at ch.89*600
Drawing C.R.E. No.269"
AMOUNT.
antity.
DESCRIPTION.
Rate. Unit.
Cts.
.01 petoniyalies)
9,300
Excavation in foundations.
Item Timbering and pumping.
4,100, Conorete in foundations.
3,450 Masonry in superstructure.
#60 Masonry in Arches.
i
130 Masonry in coping.
1,130 Dry stone backing.
10,
93.00
300
!
!
35/-
1,435 00
40/-
%
2/- 0.ft 2/-
1,380
1,920 00
00
10/-
240
11 30
8 8 8 8 8 8 9
00
Total
5,379
00
30
Contingincies 10%
537 93
Grand Total
5,917
23
JU,